(с)   Construction   of a new   road of four or more lanes, or        realignment
                  and/or widening of an existing       road of two lanes or less       so as to provide    four
                  or more lanes, where     such new road, or realigned       and/or widened section of
                  road, would be    10 km or more in a continuous       length.

                  9.    (a)   Inland waterways and ports for inland-waterway traffic which permit
                  the passage of vessels     of over 1,350 tons;

                        (b)   Trading ports, piers     for loading and unloading       connected   to land and
                  outside ports    (excluding   ferry piers) which can take vessels        of over   1,350
                  tons.

                  10.   Groundwater abstraction      or artificial    groundwater   recharge   schemes where
                  the annual volume of water abstracted or recharged           is equivalent    to or exceeds
                  10 million cubic metres.

                  11.   (a)   Works for the transfer      of water resources between      river basins where
                  this transfer aims at preventing possible         shortages    of water and where the
                  amount of water transferred       exceeds 100 million     cubic metres/year;

                        (b)   In all other cases,     works  for the transfer of water       resources
                  between river basins where the multiannual average           flow of the basin of
                  abstraction   exceeds 2,000 million      cubic metres/year     and where the amount of
                  water transferred exceeds 5 per cent of this          flow.
                  In both cases transfers of piped drinking water are excluded.

                  12.   Extraction of petroleum      and natural gas    for commercial purposes where
                  the amount extracted exceeds       500 tons/day    in the case of petroleum      and 500,000
                  cubic metres/day in the case of gas.

                  13.   Dams and other installations designed         for the holding    back or permanent
                  storage  of water, where a new or additional         amount of water held back or
                  stored exceeds 10 million      cubic metres.

                  14.   Pipelines   for the transport of gas, oil or chemicals with a diameter of
                  more than 800 mm and a length of more than 40 km.


                  15.   Installations    for the intensive     rearing of poultry     or pigs with more
                  than:

                        (a)   40,000 places    for  poultry;

                        (b)   2,000 places    for production    pigs  (over 30 kg); or

                        (c)   750 places   for sows.

                  16.   Quarries and opencast mining where the surface           of the site   exceeds 25
                  hectares, or peat extraction, where the surface           of the site   exceeds   150
                  hectares.

                  17.   Construction   of overhead electrical power lines with a voltage            of 220 kV
                  or more and a length of more than 15 km.

                  18.   Installations    for the storage    of petroleum,    petrochemical, or     chemical
                  products with a capacity of 200,000        tons or more.